67%
fewer remakes
1,070 patient cases from 136 practices.
What changed for a dental sleep appliance company after the engine went live.
Skilled designers are scarce. Fit is where cases come back.
In production for a dental sleep appliance company. Designers stopped building each case from a blank file. The engine staged a proposed design, and every design was inspected, adjusted where needed, and approved before release.
| Measure | Before | After |
|---|---|---|
| Design time | about 40 minutes | about 5 minutes |
| Remakes | — | 67% fewer remakes |
| Turnaround | about 11 days | about 4.5 days |
| Engine-produced designs | The technician built each design | 92.5% of designs produced by the engine |
| Record | — | 1,070 patient cases from 136 practices |
67%
fewer remakes
1,070 patient cases from 136 practices.
Faster turnaround
114.5days
Turnaround from about 11 days to about 4.5 days. About 59% faster.
Higher throughput per designer-hour
405min
Design time from about 40 minutes to about 5 minutes. Eight times as many designs in the same designer time.
A 20-minute design review shows how a case arrives, how the design is built, and where your technician signs off.